HOME PAGE > HYDROELECTRIC ENERGY
MENU
FIELDS OF OPERATION
SUSTAINABILITY

SHARE
HYDROELECTRIC ENERGY
With our six hydroelectric power plants with a total installed capacity of 2,290 MW, we produce clean energy and rank as the largest private sector producer in this field in Türkiye. With our innovative approach and expertise in energy generation, we further strengthen our leading position in Türkiye’s energy sector.
With our innovative approach and expertise in energy generation, we further strengthen our leadership in Türkiye’s energy sector.
We are Türkiye's leading private sector producer in hydroelectric energy.
.png)
Installed Capacity
2.290MW
.png)
Number of Operating Plants
6

Yukarı Kaleköy Dam and HPP
Located in the Solhan district of Bingöl, our plant, with an installed capacity of 626.85 MW, is the largest hydroelectric power plant operated by the private sector in Türkiye. Commissioned in 2018, the Yukarı Kaleköy Dam and HPP was selected as the world’s best project in 2019 by the International Commission on Large Dams and the Spanish Committee on Large Dams.

Beyhan-1 Dam and HPP
Located in the Palu district of Elazığ, our plant ranks as the second largest hydroelectric power plant operated by the private sector in Türkiye, with an installed capacity of 582.1 MW. Commissioned in 2015, our plant provides significant support to Türkiye’s energy supply security.

Aşağı Kaleköy Dam and HPP
As Türkiye’s first and Europe’s largest hybrid power plant, the facility is powered by two sources: water and solar. Located in Bingöl, with its installed capacity of 500 MW, our plant ranks as the sixth largest hydroelectric power plant built by the private sector in Türkiye, and it is also Türkiye’s asphalt-core dam. Commissioned in 2020, the plant was transformed into a hybrid power plant with the addition of 200,000 solar panels in the tailwater area, thereby increasing its generation capacity.

Oymapınar HPP Operation
Located in the Manavgat district of Antalya, the Oymapınar Hydroelectric Power Plant, with an installed capacity of 540 MW, constitutes one of the main energy sources used in the production of our sister company, Eti Alüminyum. With an investment of USD 14.6 million, the hydraulic and electrical control systems were completely renewed, modernizing the plant and increasing electricity generation by 5%.

Murgul HPP Operation
Located within Eti Bakır’s operations in Murgul, Artvin, and incorporated into Cengiz Holding in 2006, this hydroelectric power plant continues energy production with its installed capacity of 24.2 MW. The plant has been modernized and upgraded through capacity increase works, gaining an innovative structure.

Fethiye HPP Operation
Pioneering clean and renewable energy generation by making the most efficient use of natural resources, Cengiz Enerji established the Fethiye Hydroelectric Power Plant in line with this vision, with an installed capacity of 16.5 MW.

FIELDS OF OPERATION
SUSTAINABILITY



