Cengiz Enerji Çalışma Sahası

SHARE

Milestones

1.png
2.png
4.png
5 (1).png
8.png

2000

Cengiz Enerji Sanayi ve Ticaret A.Ş. was established.

2003

Cengiz Enerji’s 132 MW dual-fuel combined cycle power plant was commissioned.

2004

Started natural gas distribution operations in Samsun. (SAMGAZ)

2005

Completed the 59 MW natural gas-fired combined cycle power plant belonging to NUH Cement.


Completed turnkey construction of the Vahxir Hydroelectric Power Plant in Azerbaijan.

Assumed operation of the 540 MW Oymapınar Hydroelectric Power Plant.

2007

Started natural gas distribution operations in the Seydişehir and Çumra Region. (SELÇUKGAZ)

2009

Started electricity distribution operations in the Meram Region. (MEDAŞ)

2010

The 240 MW natural gas-fired combined cycle power plant in Samsun was commissioned.


Started electricity distribution operations in the Çamlıbel Region. (ÇEDAŞ)

2013

Started electricity distribution operations in the European side of Istanbul. (BEDAŞ)


Started electricity distribution operations in the Mediterranean Region. (AKDENİZ 

2015

The 600 MW natural gas-fired combined cycle power plant in Samsun was commissioned.

The 582 MW Beyhan Hydroelectric Power Plant was commissioned.

2017

Our solar power plants with a total capacity of 95 MW were commissioned.

2019

The 500 MW Aşağı Kaleköy Hydroelectric Power Plant was commissioned.


The 48 MW Mazıdağı natural gas-fired combined cycle power plant was commissioned.

2020

The 80 MW Aşağı Kaleköy Solar Power Plant was commissioned,

becoming Europe’s largest and first hybrid power plant.

Our 14 MW solar power plants were commissioned.
 

2025

Our 52 MW solar power plants were commissioned.

2016

Our first solar power plants with a total capacity of 45 MW were commissioned.

2018

The 1,320 MW imported coal-based thermal power plant in Karabiga, Çanakkale was commissioned.


The 626 MW Yukarı Kaleköy Hydroelectric Power Plant was commissioned.

2021

Our 80 MW solar power plants were commissioned.


Our first wind power plant with a capacity of 13 MW was commissioned.

2024

Construction of the 550 MW natural gas-fired combined cycle power plant in Jizzakh, Uzbekistan started.


Our 64 MW solar power plants were commissioned.

2022

The 240 MW natural gas-fired combined cycle power plant in Tashkent, Uzbekistan was commissioned.


The 240 MW natural gas-fired combined cycle power plant in Sirdaryo, Uzbekistan was commissioned.


Our 50 MW solar power plants were commissioned.


Our new 80 MW wind power plants were commissioned.


Our 40 MW solar power plants were commissioned.


Our new 70 MW wind power plants were commissioned.